Technically, there is currently no direct integration with the ACCPAC PJC module. Production costs generated in AutoSimply via MO processing can be recorded against the PJC contract/project using the PJC Material Usage transaction. In terms of tracking, we would recommend that the PJC contract number be inputted as MO reference.
Reports can then be created to track and analyze MO’s based on project number. More.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.