How does the Technology Planning Tool align with the five E-Rate criteria set forth by the SLD?

E-Rate Critical icons are located throughout the TPT. These icons, , specify the sections of the TPT that are essential to addressing the five E-Rate required technology planning elements listed below. Suggestions for addressing E-Rate technology plan requirements are provided where you see the E-Rate Critical icon.

E-Rate Critical icons and content are located in the following sections of the TPT: 1.2, 1.4, 2.2-2.8, 4.1, 4.2, 4.4, 4.6 and 5.0. More.

I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.

Related Questions