WSDOT completed a final design and advertised for bids in September 2008. Construction takes approximately 18 months, and the first vessel is scheduled to be delivered in spring 2010. The shipyard contract will include an incentive for early delivery and WSDOT is doing everything possible to find ways to accelerate the construction schedule for the new ferries.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.