A new tunnel/ocean outfall would be sized based on the findings of the Clearwater MFP.At a minimum, a new tunnel would need to be large enough to accommodate peak flows at the JWPCP through the year 2050 planning horizon. The Sanitation Districts prefer to convey as much flow by gravity as possible to increase reliability, conserve energy, and reduce operating costs.It is estimated that the tunnel will have an excavated diameter of approximately 20 to 22 feet and an internal finished diameter of approximately 18 feet. More.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.