Start from scratch and try again (starting with . NET 2.0).
Open a package in the BID. Then the control flow items will show up. All other items(eg data flow tak) will be greyed out Drag a control flow item.
For eg, if you drag a data flow task, then edit it. Now the toolbox will show Data Flow destinations and transformations. This means, BID will show control flow items if the control flow tab is active.
Then you can drag a control flow items and edit it to add any task based on the control flow task you added.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.