Is the Internal Rate of Return calculated on an individual energy conservation measure basis, or on a total project basis?

The Internal Rate of Return for the entire project must be 10% or greater. There is no IRR requirement for individual measures. More.

I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.