(1) Section C.11.7.2 (Referenced as C. 10.12.2 in Amendment 2) states the following: "Based on panel read-outs, the UPS systems for the current system, which is in transition to the April 2005 upgrade, provide a ride-through for the computer systems of 16 minutes on the 500-KVA UPS and 25 minutes on the 225-KVA UPS". Battery replacements to the 500-kVA UPS and additional system load are expected to change these ride-through times over the next month (See Answer to Question #290).
(2) This is currently shared between Raytheon, SGI and the Government and can be removed if the space is needed. More.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.