While the level of completed design may affect the proposals, clearly defining the project's scope is critical to the ultimate success of the project. The level of design included in a request for proposals (RFP) will depend on the size and complexity of the project, the degree to which performance specifications are used, and the owner's desire to allow for design innovation while controlling scope. Both the clarity of the scope and the level of design impact the ability of the proposers to respond to the initial RFP, and the selected design-builder to develop a cost-effective and constructible project de more.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.