When you place an order with us for a dry line, we first order a loop from the ILEC (Incumbent Local Exchange Carrier). The ILEC will send the order to engineering that will form a loop from the CO (central Office) to your location. The ILEC will use existing cooper in your area and via splice points, create a loop to your location.
Note the ILEC will NOT install new copper wires. If they do not have any clean copper they will report back to us with "no Facilities", in which case we will contact you. Once the ILEC delivers the loop to your location, they will call us to test the loop.
We will make sure the loop meets our qualifications, and we will either accept, or reject the loop. More.
I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.