A. This is achieved by using 3mm hot galvanised steel wire and 50mm x 50mm BRC mesh set into brackets tying ceiling, wall floor, vertically horizontally and laterally as shown. On the top of the wall the junction with the floor plates polyinsulator is removed and we form a concrete ring beam as shown in diagram 6.

More.

A. This is achieved by using 3mm hot galvanised steel wire and 50mm x 50mm BRC mesh set into brackets tying ceiling, wall floor, vertically horizontally and laterally as shown (diagram 5). On the top of the wall the junction with the floor plates polyinsulator is removed and we form a concrete ring beam as shown in diagram 6.

More.

I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.

Related Questions