Can new built-up roofs be coated with aluminum coatings sooner than the recommended 90 to 180 days weathering period?

If an aluminum surface coating must be applied sooner to a new built-up roof, a water based emulsion coating should be used instead of a solvent-based asphalt coating. An emulsion coating will provide a firm base on which to apply the aluminum coating 5 to 10 days after the emulsion has cured. More.

I cant really gove you an answer,but what I can give you is a way to a solution, that is you have to find the anglde that you relate to or peaks your interest. A good paper is one that people get drawn into because it reaches them ln some way.As for me WW11 to me, I think of the holocaust and the effect it had on the survivors, their families and those who stood by and did nothing until it was too late.